Maplewood-Mcleod Park

This project involves: 1) preparing a park master plan per PAR 04.00.01;2) designing and construct improvements in an existing undeveloped neighborhood park, located between Cherrywood Avenue and Maplewood Avenue; and, 3) naming the park per PAR 01.00.01. The naming process will be integral with the park master planning process. The park is composed of three ... Read more

Meridian Sewer Main Improvements – South of I-5 to North of Van Wyck Road

Corner of Meridian Street that is part of the EU-0184 project
Project Overview: EU184 Meridian Street is a 5-lane principal arterial street in north Bellingham serving the Birchwood and Cornwall Park neighborhoods south of Interstate 5 and serving the Meridian neighborhood north of I-5 as State Route 539. The project limits are from approximately 800 feet north of Van Wyck Road and approximately 800 feet south ... Read more

Shuksan Meadows Park Playground

Shuksan Meadows
​Description​ The new playground equipment is open for use by pre-school and school-aged children. Also recently installed are a picnic table and park bench. The schedule for the installation of upgraded drinking fountain and park lighting is to be determined. Located adjacent to Shuksan Middle School on Bellingham School District property this .7-acre Shuksan Meadows ... Read more

Cornwall Memorial Park Improvements

Description The City is working on improvements to Cornwall Memorial Park, including wayfinding signage, site restoration, increased public access, and new trail connections. Funding TBD Status Design and feasibility analysis of a new, through-route trail connection from Cornwall Avenue to the Squalicum Creek Trail Corridor near the Birchwood/Squalicum Way intersection is currently underway. Reference Cornwall ... Read more