Phase I improvements include demolition of existing paved surfaces, disposal of buried concrete, the construction of a baseball field, restroom building, site infrastructure, site grading, parking lot lighting and pedestrian amenities.
This project includes the addition of 410 feet of 16 inch ductile iron watermain under Eldrigde bridge over Squalicum Creek as well as minor repairs and restoration of the historic Eldridge bridge itself.
Little Squalicum Park trail connector from the Bay-to-Baker trail through Squalicum Creek Park.
Picnic shelter located at 2709 Cedarwood Ave.
Neighborhood trail connecting Cottonwood Ave. to McLeod Ave in the formerly undeveloped Laurelwood Ave. right-of-way.