This project provides a key access point to theCentral Avenue Waterfront Development area by rebuilding the existing road superstructure, improving pedestrian facilities and installing a traffic signal at the Roeder/Central intersection.
The 2011 Annual Overlay Program aims to maintain existing streets to protect the initial investment in the street and to ensure an adequate quality driving surface for mobility and public safety.
This is a cooperative project where Puget Sound Electric (PSE) rebuilds 4kv electric distribution as 12.47 kv underground system and the City of Bellingahm provides trenching and alley restoration. Neighborhood: Central Business District
Crushed toilets used as an alternative to traditional concrete.
The Federal Building, located at the corner of Magnolia and Cornwall Avenue, is listed on the Washington Heritage Register and the National Register of HIstoric Places. The work includes installation of a larger, code-complaint elevator, etc.
The 2009-2010 Sewer Replacement project consists primarily of replacing manholes and restoring sanitary sewer lines to near new condition through the use of trenchless technology and open cut methods in portions of seven neighborhoods.