2020 Overlay – Bill McDonald and Britton Road

​​Project Overview: ES-0554 This project is an overlay of Bill McDonald Parkway from 20th Street t​o Samish way and Britton Road from Northshore to the City limits, with the purpose of improving road driving surface and ADA access. ​ Funded by Street and ​Transportation Benefit District. ​ Project Status – July 2020​ Accomplishments: ​Project under construction. Next Milestone: Complete concrete work ... Read more

2019 Transportation Benefit District Projects

​​Project Overview:  ES-0547 This project consists of Transportation Benefit District-funded pedestrian and bicycle improvements throughout Bellingham.  The purpose of this project is to reduce risk and improve connectivity for pedestrian and bike travel in accordance with the City's Bicycle and Pedestrian Master plans.  This project includes new sidewalks on portions of Yew Street, 24th and Lakeway / ... Read more

Resource Recovery at Post Point

​​​Project Overview: We are planning now for future improvements at the Post Point Wastewater Treatment Plant (Post Point). These improvements are needed because equipment is aging, expensive to repair, and incinerates – rather than recovers – reusable resources. The goal is to provide sustainable, environmentally responsible, cost-effective wastewater treatment into the future. Through this project, ... Read more

2020 Watermain Replacement Project – Donovan Avenue

​​​Project Overview:  EW-0234 This is the annual water main replacement project to replace aging main on Donovan Avenue between Old Fairhaven Parkway and 30th Street. The water main along Donovan Avenue was installed in 1926 and has failed three times in the past two years. The main is operating at very high water pressure due to the topography ... Read more