Horton and W. Bakerview Lift Stations

​​​​​​​​​​​Project Overview: EU-0183 This project will assess the two lift stations and determine the appropriate repairs and/or upgrades needed to handle the future sanitary sewer capacity at the lift stations. Once a determination has been made the project will move to design and construction. Status – September 2020 Accomplishments: Carollo Engineers has performed the modeling on the lift ... Read more

Northwest/Bakerview Intersection Improvements

​​​​​​​​​​​​​​Project Overview: ES-0546   This project will evaluate and improve pedestrian and bicycle safety and efficiency through the reconstruction of curb ramps, sidewalk, traffic islands, and installation of improved visibility pavement markings in the vicinity of the Northwest Avenue and West Bakerview Road intersection. It also involves evaluating and adding center median along West Bakerview Road ... Read more

Meridian Street Water Quality Retrofit

​​​​​Project Overview:  EV-0162 This project will provide water quality retrofit treatment through construction of water quality treatment facilities along Meridian Street (State Route 539) between Bakerview Road and Stuart Road, and on Kellogg Road.  This project addresses untreated runoff from one of the highest-volume roadways in the City. Portions of Meridian Street, which has an ... Read more

Meridian Street Roundabouts Feasibility Study

​Project Overview: ES-0550 In 2019, Public Works staff and Reid Middleton consultants are engaged in a comprehensive study of the two closely-spaced intersection at Meridian/Birchwood and Meridian/Squalicum to examine alternatives to converting these intersections into roundabouts.  The traffic signals at these two intersections must be operated in tandem and they are nearing the end of their functional ... Read more

Telegraph Road Multimodal Improvements

Project Overview:  ​ES-0537 The project will upgrade and rehabilitate the Telegraph Road corridor from Deemer Road to James Street.  The existing narrow rural road has limited, substandard pedestrian and bicycle facilities.  This multimodal improvement project will reconstruct this corridor to a complete urban street, with typical amenities of multimodal features and services including sidewalks, street ... Read more

Julianna Park

​Description  The City of Bellingham adopted a master plan for this neighborhood park in 2008. Located along the 800 block of Horton Road, this park includes developed trails, picnic tables, benches, and grass meadow.  ​We are now starting the design and permitting process for additional improvements at the park in  preparation for the future road ... Read more