The playground equipment at Boulevard Park is scheduled for replacement in May-June 2013.
The 2014 Annual Overlay Program aims to maintain existing streets to protect the initial investment in the street and to ensure an adequate, quality driving surface for mobility and public safety.
The 2013 Sewer Main Replacement Program is part of an annual program to replace, repair, and improve the Citys sewer system to extend the useful life of the existing system by 40 years or more.
The 2013 Annual Overlay Program aims to maintain existing streets to protect the initial investment in the street and to ensure an adequate, quality driving surface for mobility and public safety. Neighborhoods: WWU; Highland Dr; Irongate and Sehome.
The Boulevard Park shoreline was eroding away as a result of ineffective shoreline armoring. Improvements included removing concrete rubble along the shoreline, creating sand and gravel beaches and rock revetments.
Yearly sewer main replacement of pipes nearing their lifecycle end assures long term system health and service to the public. Neighborhoods: South Hil, Columbia and Roosevelt