Westside Non-Motorized Improvements

Looking across an empty crosswalk on the road.
Project Overview The Westside Non-Motorized Improvements Project (ES563) will add and improve bicycle and pedestrian infrastructure in 15 locations throughout Bellingham, primarily on the west side of town. The project includes improvements in the following areas: Project Status – April 2024 Construction is wrapping up with just a few remaining intersection improvements to complete. Bike ... Read more

Meador Avenue and James Street Whatcom Creek Bridge Replacement Projects

Aerial view of bridge going over Whatcom Creek
Project Overview: ER015 & ER016 James Street and Meador Avenue are federally classified major collectors serving the surrounding neighborhoods in the middle of Bellingham. The two bridges to be replaced cross over Whatcom Creek and are nearly identical. They were originally built in 1936 and rebuilt in 1962. Both are built on timber piers which ... Read more

State-Ellis Bridge Replacement

Whatcom Creek flowing under the State-Ellis Street bridge
Project Overview: ER014 The State-Ellis Bridge across Whatcom Creek was a timber structure bridge supported by wooden piles located at the intersection of State and Ellis streets. The bridge was built in the 1930’s and gradually deteriorated over time, requiring replacement. The new bridge structure is a single span concrete structure over Whatcom Creek. The ... Read more

Whatcom Creek Trunk Main

​​​​​​​​​​​Project Overview: EU182 This project re-lined a 1909 sewer trunk main along Whatcom Creek from Nevada right-of-way West to the State/York intersection. The goal of the project is to extend the life of the egg-shaped pipe by re-lining the interior. Videos of the interior of the main showed deterioration in the pipe including holes and ... Read more

2020 TBD Projects and 40th Street Sidewalk

​​​​Project Overview: ES553 This project included pedestrian and bicycle facility improvements throughout Bellingham, including a new sidewalk on the east side of 40th Street from El​wood to Fielding and improvements at the Grant/Kentucky intersection. Funded by Street and Transportation Benefit District. ​ 40th Street Project Fencing The construction of the new 40th Street sidewalk along the ... Read more

Water Main Replacement Program (2014-2015)

The 2014-2015 Water Main Replacement project is part of an annual program to replace aging water mains that are at the end of their lifecycle and require upgrades to better provide reliable water service.