Samish-Maple-Ellis Multimodal Safety Improvements

​​​​​Project Overvi​​ew:  ES-0552 In 2016-2017, the City (Public Works and TranspoGroup consultants) completed a comprehensive corridor study to examine alternatives to reduce collisions, construct bikeway facilities, improve pedestrian safety, and improve the streetscape environment along 3/4 mile of the Samish-Maple-Ellis corridor from Bill McDonald Parkway to Lakeway Drive.  The 2009 Samish Way Urban Village Plan made some recommendations for ... Read more

Water Main Replacement Program (2014-2015)

The 2014-2015 Water Main Replacement project is part of an annual program to replace aging water mains that are at the end of their lifecycle and require upgrades to better provide reliable water service.

Lakeway Drive Bikeway Study

Cars and bicyclists on busy street in Bellingham
This study is a comprehensive look at how to provide a bikeway on Lakeway Drive from Woburn to Ellis, as indicated in the 2014 Bicycle Master Plan. Pedestrian improvement needs will also be considered as recommended in the 2012 Pedestrian Master Plan.

Water Main Replacement Program (2014-2015)

The 2014-2015 Water Main Replacement project is part of an annual program to replace aging water mains that are at the end of their lifecycle and require upgrades to better provide reliable water service. This project will replace water mains on Champion Street, Nevada Street, and Sunset Drive. Construction is currently scheduled for May 2016 to November 2016.