Northridge Detention Pond Retrofit

Northridge Detention Pond Retrofit project originally started as a storm water treatment enhancement project to be constructed on a city parcel along Barkley Blvd.

James Street Pedestrian Enhancement

This project consists of enhancements for the pedestrian crossings at the James/Kentucky intersection and the James/Carolina intersection.

Northshore Drive Roadway and Drainage

Northshore Drive Roadway and Drainage Improvement Project includes a major overlay that was originally slated for construction in 2006 and has had sidewalk facilities and storm water system improvements added.

Holly Street Gateway Improvements

The project consists of streetscape improvements along upper Holly Street between Ellis Street and Railroad Avenue. Included in the project is the replacement of all curb, gutter and sidewalk, the addition of new traffic signals & street lighting, plants.

Bridge Rehabilitation Crack Repair

This project consists of epoxy injection of existing cracks in bridges throughout the City of Bellingham. Bridges to be repaired were indentified in the 2006 Bridge Inspection Report.

Depot Market Square Lease Space Improvements

The design for Depot Market Square when construction was completd in 2006 a 930 square foot unfinished space in the northeast corner of the facility which was slated to be improved once the space was leased. Ralf's Bavarian Bakery leased February 2008.