Bridge Rehabilitation Crack Repair

This project consists of epoxy injection of existing cracks in bridges throughout the City of Bellingham. Bridges to be repaired were indentified in the 2006 Bridge Inspection Report.

Depot Market Square Lease Space Improvements

The design for Depot Market Square when construction was completd in 2006 a 930 square foot unfinished space in the northeast corner of the facility which was slated to be improved once the space was leased. Ralf's Bavarian Bakery leased February 2008.

Champion Streetscape and Waterline

The project consists of installation of streetscape improvements and water main on Champion St between Grand Ave & Holly St. Work includes installation of water main, curb and gutter sidewalk, pavement, street lighting, vegetation & other related items.

Sunset Drive Reconstruction Phase II

This project widens Sunset Drive from 2 lane to 5 lanes, including a two-way, left-turn lane; two bike lanes; sidewalks on both sides; and bus pullouts. The project is roughly 0.8 miles long and extends from Woburn Street to McLeod Road.

2007 Sanitary Sewer Rehabilitation

This project will replace existing manholes and restore sanitary sewers to near new condition through the use of trenchless technology and open cut methods in various neighborhoods.

2007 Sidewalk Replacement

This project is part of an annual program to replace existing sidewalks to increase safety on city streets and intersections. Where needed, upgrades to pedestrian crossing curbs ramps will be updated to comply with current standards. Columbia Neighborhood