Lake Whatcom Water Quality Projects

Project includes installation of stormwater conveyance and treatment facilities and infrastructure improvements on East North Street and East Oregon Street in the Lake Whatcom Watershed.

Eldridge Avenue Bridge Restoration

This project includes the addition of 410 feet of 16 inch ductile iron watermain under Eldrigde bridge over Squalicum Creek as well as minor repairs and restoration of the historic Eldridge bridge itself.

Fraser Street Improvements

This bicycle and pedestrian project includes roadway improvements on Fraser Street from Lincoln to Puget Street. Enhancements include adding two bike lanes, sidewalk, street lights and storm drainage infrastructure.

2005-2006 Sewer Main Replacement

The improvements consists of : rehabilitating roughly 11,880 linear feet of sanitary sewer pipe using Cured In Place Pipe (CIPP) and open cut methods, replacement of 31 manholes, and restoration of appurtenant structures effected by construction.

West Street Pedestrian Improvements

This project provides for the rehabilitation reconstruction of West Street between Squalicum Parkway & North Street. The final project will result in a roadway consisting of two 10-foot lanes, curbing, storm water controls, & 10-foot wide pedestrian path.

Larrabee Elementary Safe Route to School

The project improvements consist of site grading, placement of concrete curb, gutter and sidewalk and new pavement markings at selected street intersections near the Larrabee Elementary School.