Holly Street Gateway Improvements

The project consists of streetscape improvements along upper Holly Street between Ellis Street and Railroad Avenue. Included in the project is the replacement of all curb, gutter and sidewalk, the addition of new traffic signals & street lighting, plants.

Bridge Rehabilitation Crack Repair

This project consists of epoxy injection of existing cracks in bridges throughout the City of Bellingham. Bridges to be repaired were indentified in the 2006 Bridge Inspection Report.

Champion Streetscape and Waterline

The project consists of installation of streetscape improvements and water main on Champion St between Grand Ave & Holly St. Work includes installation of water main, curb and gutter sidewalk, pavement, street lighting, vegetation & other related items.

Sunset Drive Reconstruction Phase II

This project widens Sunset Drive from 2 lane to 5 lanes, including a two-way, left-turn lane; two bike lanes; sidewalks on both sides; and bus pullouts. The project is roughly 0.8 miles long and extends from Woburn Street to McLeod Road.

2007 Sidewalk Replacement

This project is part of an annual program to replace existing sidewalks to increase safety on city streets and intersections. Where needed, upgrades to pedestrian crossing curbs ramps will be updated to comply with current standards. Columbia Neighborhood

Pullman Roadway and Storm Improvements

Project includes improvements to Pullman Street and the adjacent alley know as Maryland Street including portions of curb and gutter, storm drain and enhanced storm water treatment. In addition, the project will include resurfacing of the street w/asphalt