Project Overview
This project (ES 569) will repair deteriorating pavement, replace aging utilities, and make changes to crosswalks to bring them up to current ADA standards. The streets to be overlayed are:
- Fraser Street from Puget Street to Valencia Street
- Lincoln Street from Elwood Avenue to E. Maple Street
- Ellis Street from E. Illinois Street to Squalicum Parkway; includes water main replacement

Project Status – Fall 2026
Construction began in mid-September and is scheduled to be complete by May, 2027, with different segments done earlier. Each section will have temporary pedestrian detours and traffic delays during construction work.
Construction Impacts & Timing – 2026
Ellis Street
Repaving and watermain replacement will take place along Ellis Street between E. Illinois Street and Squalicum Parkway from October through May. Coordinating these improvements will reduce costs and disruption while addressing utility and traffic safety needs at the same time.
- Daytime work will take place along Ellis Street between E. Illinois and Sunset Drive; the road will be closed to through traffic intermittently through early December, approximately. Local access will remain open, with some on-street parking restrictions.
- Night work: Night work (8 p.m. – 6 a.m.) is taking place from November 2 to early December along Ellis Street from Sunset Drive to Squalicum Parkway to replace the water main, with staging occurring near Plymouth Drive. Night work will help minimize traffic impacts near St. Joseph Hospital.
- Potential water outages: Residents along Ellis Street between E. Illinois and Squalicum Parkway and along Illinois Street between Sunset Drive and James Street may also experience temporary water outages between November 16-25 while the new water main is installed and tested. Outages may occur during the connection of the new main depending on the results of testing. Residents will be notified by the contractor with a door hanger 48 hours in advance of any planned outages as well as the timing and duration of the outage.
- Other impacts: Temporary water outages, on-street parking restrictions, and construction equipment storage and noise in the surrounding neighborhood are expected. All water outages will be communicated by our contractor (Faber Construction) at least 48 hours in advance.
Fraser Street
- Paving and restriping work is complete.
- Crossing enhancements in front of Regency Park Apartments are complete including curb ramp upgrades for ADA compliance, refreshed markings, and the addition of a pedestrian refuge island.
Lincoln Street
- Paving work is complete.
- There may be some lane shifts during the day as striping and finishing work is completed.
Contact
General questions: askpw@cob.org
Media Inquiries: pwmedia@cob.org
Project Engineer:
Keenan Thomas, Engineer I
kwthomas@cob.org
360-778-7905
360-778-7700 (main department line)