Holly Street Corridor Study (Broadway to Ellis)

The 2024 Bicycle Master Plan prioritizes Holly Street from Ellis Street to Broadway as a key corridor for bicycle improvements. The Bicycle Master Plan is guided by a data-driven network analysis and extensive public and stakeholder input. This project evaluated approaches for establishing cycling infrastructure along the entire Holly Street Corridor and assessed how best to close a critical gap in the City’s bike network. This project addresses needs identified in the City’s Local Road Safety Plan.

Corridor Study Final Report

The Holly Street Corridor Study evaluated the roadway as six separate segments to identify preferred designs for each that advance a long‑term vision for a continuous, separated bike facility along the corridor. Guided by community input and staff recommendations, a near‑term project will move into design to construct multimodal facilities along Holly Street between West Champion Street and Broadway, focusing on locations without existing bike facilities to close network gaps, improve safety at key locations, and enable phased upgrades over time. Improvements between Ellis Street and West Champion Street may proceed in the future, with scope and timing informed by the Downtown Connections Study and available funding.

For study details on evaluated alternatives, you can review the Holly Street Corridor Alternatives Study Final Report. Next, the team will develop a 10% design roll plot for the Holly Street Multimodal Improvements – Broadway to Champion project and prepare a construction cost estimate to support project implementation.

More Information

This project is included in the City’s 2026-2031 Transportation Improvement Program.

  • Corridor Study: began summer 2025
  • Contractor: MIG selected for planning and design services
  • Expected study completion: summer 2026

From August through September 2025, the City gathered community input on corridor priorities through an Engage Bellingham campaign. This feedback is helping inform the Holly Street Corridor Study, from Ellis to Broadway. You can review community questions and answers on the Engage Bellingham Final Design – Holly Street Corridor page. The City will announce additional opportunities for public input as the project design moves forward.

Funding for this project comes from the Transportation Fund. The total estimated cost of this project is $350k.

Transportation Data

An engineering evaluation of existing roadway conditions in 2016 identified a high level of traffic stress for bicyclists along this stretch of Holly Street. This indicates a functional gap in the active transportation network that poses systemic safety risks, likely deterring all but the most confident riders. Despite these challenges, data shows that bicyclists make up approximately 3.6% of total traffic during the afternoon peak hour, underscoring the importance of this corridor in the city’s bike network.  

City’s Commitment to Improving Multimodal Transportation Options

For more than 15 years, downtown Bellingham has steadily expanded active transportation facilities, adding bike lanes to most downtown arterials. However, Holly Street remained a notable exception until the 2024 bike lane pilot project began addressing this gap. 

2024 Holly Street Bike Lane Pilot Project

The 2024 Holly Street Bike Lane Pilot Project reaffirmed Holly Street’s significance as downtown Bellingham’s busiest bike corridor, with ridership surpassing the next highest route by more than 44% between June and September 2024. Findings from the Pilot highlight the need for improved bicycle facilities along this corridor to support the city’s overarching multimodal transportation goals.

Community Input on Pilot

Through the pilot, we conducted rigorous data collection and analysis to provide objective evidence of the project’s impact on pedestrians, vehicles, and transit. Extensive community engagement also helped shape the pilot’s direction, generating more than 1,300 comments and 1,171 survey responses through EngageBellingham. 

Public feedback on the pilot project reflected a range of perspectives, with significant concerns regarding safety, traffic flow, and overall design. Data analysis reflected these concerns, particularly visibility challenges at intersections with the parking-protected bike lane, where a higher frequency of right-hook conflicts occurred. This feedback, combined with data findings, informed several project modifications, including the addition of bend-ins at intersections and street re-channelization. In summer 2025, the City replaced parking-protected bike lanes with traditional buffered bike lanes to improve visibility, similar to those already found throughout Bellingham. These iterative adjustments demonstrate the importance of both community engagement and a data-driven approach in refining project design. You can find more information about the pilot project on the Holly Street Bike Lane Pilot Project webpage.

Contact

General project questions: AskPW@cob.org

Media inquiries: pwmedia@cob.org

Project Manager
Freeman “Fritz” Anthony, Engineering Manager
Email: fanthony@cob.org

Participating Departments

Affected Neighborhoods

Similar Projects by Topic

Our public calendar is being upgraded and may be unavailable for periods of time on Friday, Jun 19.

Secret Link