Community Streets Program

Welcome to Community Streets! Through this program, we collaborate with Bellingham residents to identify issues on non-arterial, residential streets and find solutions to make them safer, calmer, and more comfortable for everyone who uses them. In 2026, we are focusing on input and improvements for residential streets located in the Birchwood, Columbia, Cornwall Park, Lettered Streets, Sunnyland, City Center, and York neighborhoods.

The next feedback collection period will be for Group C, opening in January 2027. Those neighborhoods will include Roosevelt, Alabama Hill, Puget, Whatcom Falls, and Samish.

You can review the full Group B results and recommended project list in the 2026 Community Streets Program Summary Report, which the Transportation Commission approved on October 13, 2026. Public Works presented the final Report and approved project list to City Council on November 16, 2026.

We had a record level of participation this year, with nearly 700 submissions received between January and March 2026. All eligible concerns received by March 31, 2026, received an engineering assessment. After an initial evaluation, 20 areas were selected for in-depth traffic safety studies. Together, these locations represent more than 60% of all eligible survey responses received and included 67 individual study sites distributed evenly throughout Group B.

    2026 Community Streets focus area

    Where we address concerns

    We’ve divided Bellingham into four sections, which we refer to as Groups A, B, C, and D. Each year, we shine a spotlight on one of these sections, focusing on approximately a quarter of our community. This rotating approach means that every four years, each group gets its turn to receive the program’s attention, ensuring a fair and balanced distribution of resources across our city. Below is a look at our planned timeline for the next four years:

    • 2026: Group B – Birchwood, Columbia, Cornwall Park, Lettered Streets, Sunnyland, City Center, York
    • 2027: Group C – Roosevelt, Alabama Hill, Puget, Whatcom Falls, Samish
    • 2028: Group D – Sehome, WWU, South Hill, Happy Valley, Fairhaven, Edgemoor, South
    • 2029: Group A – Cordata, Meridian, King Mountain, Irongate, Barkley, Silver Beach

    The Community Streets Program addresses traffic concerns on non-arterial, residential streets. Residential streets provide direct access to homes within your neighborhood, are intended to be calm and quiet, and are not designed to move vehicles from one part of the city to another.

    Example of a residential street in Bellingham (Grant Street)

    Here’s what to expect:

    Each program cycle, the following steps will be followed for each group, with a focus on one group per year.

    • Step 1 – Identify
      • Notice a traffic issue on a residential street you live on or frequently use within our 2026 focus area? Tell us about it.
    • Step 2 – Report
      • Submit your concerns via our online survey, by calling (360) 778-7700, or in person by March 31 during the year your neighborhood is included in our spotlight. Questions? Email us at CommunityStreets@cob.org
    • Step 3 – Evaluation
      • We’ll review your concern, conduct traffic safety studies, and analyze the data. You’ll receive updates as your submission is evaluated and we work to identify the most appropriate solution.
    • Step 4 – See Results
      • Track the progress of your concern on our interactive map below and see how your input is making a difference. To review the results from our first round of Community Streets in 2025, check out our results section below.

    Community Streets Program Results

    Traffic calming projects prioritized for Group A were installed on four residential corridors in summer 2026. Before implementation, these streets were identified as among the highest-need locations for neighborhood traffic calming in the area.

    Traffic data collected in October 2026 show the improvements are working. Typical vehicle speeds across all project corridors have decreased to about 22 mph, and the share of drivers traveling at or below 20 mph has more than doubled. The result is calmer, safer residential streets for people who live, walk, bike, roll, and drive in these neighborhoods. Review the results for each corridor below.

    Tremont Avenue project results, showing that the speed most drivers travel on Tremont Ave has slowed to 20 mph since 3 speed humps were installed in August 2026.
    Tremont Ave Project Results
    Magrath Road project results, showing that the speed most drivers travel on Magrath has slowed to 21 mph since 2 speed humps were installed in August 2026.
    Magrath Road Project Results
    Silver Beach Avenue project results, showing that the speed most drivers travel on Silver Beach Ave has slowed to 21 mph since 2 speed humps were installed in August 2026.
    Silver Beach Avenue Project Results
    Sylvan Avenue project results, showing that the speed most drivers travel on Sylvan Ave has slowed to 22 mph since 2 speed humps were installed in August 2026.
    Sylvan Street Project Results


    Learn more

    Our public calendar is being upgraded and may be unavailable for periods of time on Friday, Jun 19.

    Secret Link