The project built a minimized footprint, two-lane roadway with shoulders designated as bicycle lanes. The project cleared existing vegetation, constructed an asphalt road section and sidewalk, and added drainage, stormwater, sewer and illumination. Areas of the roadway prism were constructed to facilitate hydraulic connectivity between wetlands divided by the new alignment.
The project provides at least a segment of a “Safe Route to School” serving Cordata Elementary School on Aldrich Road. Intersection and sidewalk improvements on Aldrich along with a revised connection to the existing West Horton Road alignment were evaluated during design.
This project reduces congestion on roadways to the east, by enhancing the currently limited east-west access in the area, and provides access to Cordata Park. Funding is from the Surface Transportation Program (STP) (WCOG).
Project Details
- Status – Construction complete
- Contract awarded – Jan. 27, 2020
- Contract amount – $3,130,514.93
- Contractor – Ram Construction
- Completion Date – February 2021