Parkview Safe Routes to School

Group of school-aged girls crossing the street at a crosswalk
Project Overview The Parkview Safe Routes to School Project (ES560) will add key regional sidewalks on Coolidge, Indiana, Cornwall and Vallette Street along with improvements along West Illinois. The project will also add a flashing beacon and crosswalk at Vallette Street. This project improves pedestrian and driver safety along a route to Parkview Elementary School ... Read more

Meridian Sewer Main Improvements – South of I-5 to North of Van Wyck Road

Roadway with traffic cones
Project Overview: EU184 The Meridian Sewer Main Improvements Project will replace aging infrastructure and aims to reduce the likelihood of sanitary sewer overflows and accompanying impacts to public health and the environment by adding capacity to the sewage collection system, which is a network of pipes and pumping stations used to transfer wastewater/sewage. This project ... Read more

Meridian-Girard Multimodal Safety Improvements

​​​​​​​​​​​Project Overview:​ Bike Lanes, ADA upgrades, Roundabout  ​​ In 2019, Public Works commissioned the West Illinois Street Multimodal Corridor Traffic Study to examine the pedestrian, bicycle, and vehicular improvement needs on the West Illinois Street corridor from Sunset Drive to Lynn Street. The study included specific operational analysis of the Meridian/Illinois intersection as an existing traffic signal ... Read more

Cornwall Memorial Park Improvements

Description The City is working on improvements to Cornwall Memorial Park, including wayfinding signage, site restoration, increased public access, and new trail connections. Funding TBD Status Design and feasibility analysis of a new, through-route trail connection from Cornwall Avenue to the Squalicum Creek Trail Corridor near the Birchwood/Squalicum Way intersection is currently underway. Reference Cornwall ... Read more

Squalicum Creek Re-route Phases 3 and 4

​​​​​​​​​​​​​​​​​​​​​​​​​​​​Project Overview: EV148 and EV156 ​​The Squalicum Creek Re-route Phases 3 and 4 habitat enhancement projects builds on two prior phases to address water quality and fish habitat impacts to Squalicum Creek by Bug Lake and surrounding development. Bug Lake, a man-made gravel borrow pit that was created during the construction of I-5, is currently the ... Read more

Meridian Street Roundabouts Feasibility Study

​Project Overview: ES-0550 In 2019, Public Works staff and Reid Middleton consultants engaged in a comprehensive study of the two closely-spaced intersection at Meridian/Birchwood and Meridian/Squalicum to examine alternatives to converting these intersections into roundabouts. The traffic signals at these two intersections must be operated in tandem and they are nearing the end of their functional lifespan. Squalicum ... Read more