2013 Water Replacement Program

2013 Water Main Replacement project is part of an annual program to replace aging water mains that are at the end of their lifecycle & require upgrades. Lindbergh Ave by Nequalicum Ave; E Magnolia, State St to Ellis St & Northwest Ave to Larrabee Rd

Corwall Avenue CSO Improvements

This project proposes to install rain gardens for stormwater inflitration at the intersection of Cornwall Ave and Maple St. The existing stormwater catch basins at the intersection are connected to the sewer system because there is not stormwater piping.

Central Basin Sewer Inflow and Infiltration

The Central Basin Inflow and Infiltration (I&I) Project is designed as a pilot project to study I&I contributions and evaluate techniques and cost for rehabilitation of the sewer system. Neighborhood: Sunnyland

2012 Sewer Rehabilitation – EU-0156

The 2012 Sewer Main Replacement Program is part of an annual program to replace, repair, and improve the City's sewer system to extend the useful life of the existing system by 40 years or more. Cornwall Park; Roosevelt; Sunnyland and Alabama Hill.

Marietta Reservoir

To improve the reservoir circulation and function, the Marietta Reservoir improvements include the addition of inflow piping and a secon water main connection to the site.