The project will stablize a slide area adjacent to Chuckanut Dr. The work includes drilling holes to hold a 25,000 pound design load, then inserting metal bolts to secure the rock. The work space is limited & will require reducing the traffic to one lane.
For more information about this project, see the archived project materials (PDF).