Post Point Alernative Outfall

The installation of a new 54-60 inch diameter pipe to replace the current 30-inch diameter secondary outfall that is in need of replacement. The new pipeline will follow an existing 30 inch secondary outfall from the plant, under three sets of BNSF tracks

Chuckanut Drive Roadway Improvements

This project includes curb, gutter and sidewalk on one side of Chuckanut Drive from 12th Street to Iris Lane. Pederstrian and bicycle safety will be further improved by the addition of a bicycle land and new streetlights.