Larrabee Elementary Safe Route to School

The project improvements consist of site grading, placement of concrete curb, gutter and sidewalk and new pavement markings at selected street intersections near the Larrabee Elementary School.

Kearney Road Reservoir

The 1993 Comprehensive Water Plan identified a need for additional water storage to provide fire protection and more uniform pressure in the Cordata and Bakerview areas.

2005-2006 Water Main Replacement

This project replaces approximately 12,500 linear feet of ductile iron water main, 8” in diameter. The replacements are in the South Hill, Columbia, Lettered Streets and Cornwall Park neighborhoods.

2006 Street Resurfacing Overlay Program

This annual overlay program consists of the resurfacing of existing city streets. This year the project includes installation of approximately 20,000 tons of hot mix asphalt will occur over 5 miles of existing roadways.

Chuckanut Drive Roadway Improvements

This project includes curb, gutter and sidewalk on one side of Chuckanut Drive from 12th Street to Iris Lane. Pederstrian and bicycle safety will be further improved by the addition of a bicycle land and new streetlights.

30th and Donovan Street Improvement

This project will improve 30th Street from Old Fairhaven Parkway to Donovan Avenue. Donovan from 30th to 32nd to 3/4 full standard street. Includes curb, gutter and sidewalk on one side and a bike lane on the other side.