West Illinois Street Extension

This project will be an extension of West Illinois Street to Marine Drive along the Timpson Way right-of-way. The project is funded with County, State & private dollars. Diverting truck traffic away from residential area to a designated route. Birchwood.

25th Street and Bill McDonald Parkway Signal

High student pedestrian volumes crossing Bill McDonald Parkway between Happy Valley and WWU in an area of limited sight distance call for safety improvements at this location. This project provides improved pedestrian, bicycle, transit and auto safety.

2010 Annual Overlay Resurfacing Program

The 2010 Annual Overlay Program aims to maintain existing streets to protect the initial investment in the street and to ensure an adequate quality driving surface for mobility and public safety.

2009 Resurfacing – Stimulus ARRA

This project consists of pavement preservation and resurfacing Bakerview Road from Deemer to Hannegan Road and Hannegan Road south to Sunset Drive.

Forest Street Water Main and Resurfacing Improvements

This project consists of replacement of the existing 8-inch 1914 & 6-inch 1918 cast iron water main on Forest St between Rose & York Streets. The project also consists of pavement resurfacing on Forest St & installation of bulbouts at key intersections.