The City of Bellingham is planning to complete multimodal improvements along W. Holly Street between Broadway and W. Champion Street. The Holly Street Multimodal Improvements Project (ES601) will fill key network gaps and address high-priority projects from the 2024 Pedestrian Master Plan and Bike Master Plan. The project will create safer, more comfortable crossings, add lighting, and improve accessibility for people walking and rolling. It will also provide a continuous, separated bike facility designed for riders of all ages and abilities, filling a critical gap within the city’s bike network.
This project does not include any planned changes to existing multimodal infrastructure between Ellis Street and Bay Street. We are evaluating long‑term options for the bike lanes in this area through the Downtown Connections Project.
Project Overview
The Holly Street Multimodal Improvements Project from Broadway to Champion is a direct result of the Holly Street Corridor Study. The study examined the entire roadway between Ellis Street and Broadway to identify preferred designs that advance our long‑term vision for safer and more comfortable pedestrian and bike facilities along the corridor. Guided by community input and staff recommendations, this project will construct multimodal facilities along Holly Street between West Champion Street and Broadway, focusing on locations without existing bike facilities to close network gaps, improve safety at key locations, and enable phased upgrades over time. For study details on evaluated alternatives, you can review the Holly Street Corridor Alternatives Study Final Report.
Proposed Concepts for Multimodal Improvements between Broadway and Champion
The graphics below show two example illustrations of the proposed improvements on Holly Street. The first graphic represents the proposed enhancements between West Champion Street and C Street, near Maritime Heritage Park. This part of the corridor has more space in the right‑of‑way, which allows us to keep some on‑street parking and provide wider sidewalks.
The second graphic shows the section between C Street and Broadway. Because the right‑of‑way is narrower here, we propose removing parking on both sides of the street. This is necessary to provide continuous facilities for people walking and biking throughout the corridor. To help offset the reduction of street parking on this section of Holly Street, we’ve recently expanded dedicated street parking throughout Old Town.
Typical design layout for proposed improvements to Holly Street from West Champion to C Street

Typical design layout for proposed improvements to Holly Street from C Street to Broadway

Project Status Fall 2026
The team has developed a 10% design roll plot for the project and is preparing to seek approval from the Transportation Commission and City Council for street parking removals necessary to support project implementation.