Project Overview
The Squalicum Creek Estuary Restoration Project builds on prior planning work to address three fish passage barriers and restore the degraded estuary at the mouth of Squalicum Creek. This multi-benefit project helps fulfill local, state, and federal priorities for species recovery, flood risk, water quality, and climate resilience.
Once constructed, the project will restore full fish passage to three partial barriers in the lowermost 0.1 miles of the stream system, opening up more than 40 miles of upstream habitat. The three barriers are the City-owned Roeder Avenue culvert, the Burlington Northern Santa Fe (BNSF) Railroad-owned culvert, and the Port of Bellingham-owned bridge. Due to their close proximity to each other, the barrier removals must be designed and constructed together. The City will work in close coordination with the Port and BNSF to complete a feasibility study and alternatives analysis and advance the preferred alternative to a 60% design stage.

Project Status – Spring 2025
A request for qualifications (RFQ) for Engineering design services is expected to be published in late spring 2025 with design expected to begin in summer 2025. The RFQ will provide guidelines and expectations from the City for this federally funded design phase (up to 60% design). The project includes coordination with the City, Port of Bellingham, Burlington Northern Sante Fe (BNSF), and adjacent properties, and must address contamination surrounding the project area, challenges with railroad grades, and infrastructure. Additional funding is needed for final project design, permitting, right of way, and construction phases.
More Information
Contact
General project questions: AskPW@cob.org
Media inquiries: pwmedia@cob.org
Project Engineer
Aric Smathers, PE
Phone: (360) 778-7942
Email: arsmathers@cob.org
Habitat Lead
Analiese Burns, Habitat & Restoration Manager
Phone: (360) 778-7968
Email: acburns@cob.org