Final Design – Holly Street Corridor (Broadway to Ellis)

Holly Street Corridor looking southeast towards Downtown
The 2024 Bicycle Master Plan prioritizes Holly Street from Ellis Street to Broadway as a key corridor for bicycle improvements. The Bicycle Master Plan is guided by a data-driven network analysis and extensive public and stakeholder input. This project aims to close a critical gap in the City’s bike network by establishing cycling infrastructure along the entire ... Read more

Holly Street Bike Lane Pilot

Buffered Bike Lane on Holly Street entering Downtown
In May 2024, the City of Bellingham piloted a new bike lane on Holly Street from Ellis to Bay Street to improve safety, mobility, and accessibility for cyclists and pedestrians. This project helped advance key goals outlined in Bellingham’s 2024 Bicycle Master Plan, as well as the City’s Local Road Safety Plan, to enhance pedestrian safety ... Read more

Eldridge Bike Lane Pilot Project

Eldridge Avenue post-pilot conditions
The Eldridge Pilot Project added improvements along Eldridge Avenue from Broadway to Nequalicum, enhancing safety and accessibility for pedestrians and cyclists. The project involved removing street parking to install 5-foot wide marked bike lanes with 2-foot buffers, along with significant improvements to four pedestrian crossings. Project Status – September 2025: Based on post-project data showing ... Read more
Secret Link