Samish-Maple-Ellis Multimodal Safety Improvements

​​​​​Project Overvi​​ew:  ES-0552 In 2016-2017, the City (Public Works and TranspoGroup consultants) completed a comprehensive corridor study to examine alternatives to reduce collisions, construct bikeway facilities, improve pedestrian safety, and improve the streetscape environment along 3/4 mile of the Samish-Maple-Ellis corridor from Bill McDonald Parkway to Lakeway Drive.  The 2009 Samish Way Urban Village Plan made some recommendations for ... Read more

Lakeway Drive Bikeway Study

Cars and bicyclists on busy street in Bellingham
This study is a comprehensive look at how to provide a bikeway on Lakeway Drive from Woburn to Ellis, as indicated in the 2014 Bicycle Master Plan. Pedestrian improvement needs will also be considered as recommended in the 2012 Pedestrian Master Plan.

Joe Martin Stadium Synthetic Turf Installation

Over 120,000 square feet of new baseball infield, outfield & warning track was installed and the field reopened in April 2015. The new synthetic turf outfield will be available for more recreational opportunities including soccer & lacrosse.

Civic Stadium Turf Replacement

The artificial turf at Civic Stadium, installed in 2000, exceeded its lifespan and needed to be replaced for both safety and playability in 2013.