Whatcom Creek Trunk Main

​​​​​​​​​​​Project Overview: EU-0182 This project will re-line existing sewer trunk main along Whatcom Creek from Nevada R/W West to the State/York intersection. The existing main was installed in 1909. The goal of the project is to extend the life of the life of the sewer main by re-lining the interior. ​Video of the interior of the main ... Read more

West Cemetery Creek Water Quality Project

​​​​​​​​​​​Project Overview: EN-005​3 ​​This project includes the design and construction of stream bank and channel stabilization features along West Cemetery Creek. This project will install natural bed and bank features, facilitate stormwater dispersion along the creek, and reduce sediment loads to improve water quality and restore natural processes in West Cemetery Creek and downstream water bodies.  ... Read more

Lincoln-Lakeway Multimodal Transportation Study

​​​​​​​​​​​​​Project Overview:​ ES-0555​ In 2020, Public Works is leading a multi-agency p​roject team with staff from WTA, WSDOT, WCOG and transportation planning and engineering consultants in a comprehensive multimodal transportation study for the area generally bounded by the Samish/I-5 interchange on the south; Samish-Maple-Ellis corridor on the west; Iowa/I-5 interchange on the north; and Puget Street on the east ... Read more

2020 TBD Projects and 40th Street Sidewalk

​​​​Project Overview: ES-0553 This project includes pedestrian and bicycle facility improvements throughout Bellingham including a new sidewalk on the east side of 40th from El​wood to Fielding and improvements at the Grant/Kentucky intersection. This will improve pedestrian and bicycle access.  Funded by Street and Transportation Benefit District. ​ Project Status – July 2020 Accomplishments: Project bid and awarded. Next ... Read more

2019 Transportation Benefit District Projects

​​Project Overview:  ES-0547 This project consists of Transportation Benefit District-funded pedestrian and bicycle improvements throughout Bellingham.  The purpose of this project is to reduce risk and improve connectivity for pedestrian and bike travel in accordance with the City's Bicycle and Pedestrian Master plans.  This project includes new sidewalks on portions of Yew Street, 24th and Lakeway / ... Read more