West Cemetery Creek Water Quality Project

​​​​​​​​​​​Project Overview: EN-005​3 ​​This project includes the design and construction of stream bank and channel stabilization features along West Cemetery Creek. This project will install natural bed and bank features, facilitate stormwater dispersion along the creek, and reduce sediment loads to improve water quality and restore natural processes in West Cemetery Creek and downstream water bodies.  ... Read more

2019 Transportation Benefit District Projects

​​Project Overview:  ES-0547 This project consists of Transportation Benefit District-funded pedestrian and bicycle improvements throughout Bellingham.  The purpose of this project is to reduce risk and improve connectivity for pedestrian and bike travel in accordance with the City's Bicycle and Pedestrian Master plans.  This project includes new sidewalks on portions of Yew Street, 24th and Lakeway / ... Read more

Lakeway Drive Bikeway Study

This study is a comprehensive look at how to provide a bikeway on Lakeway Drive from Woburn to Ellis, as indicated in the 2014 Bicycle Master Plan. Pedestrian improvement needs will also be considered as recommended in the 2012 Pedestrian Master Plan.

2014 Annual Overlay Resurfacing Program

The 2014 Annual Overlay Program aims to maintain existing streets to protect the initial investment in the street and to ensure an adequate, quality driving surface for mobility and public safety.

2011 Annual Overlay Resurfacing Program

The 2011 Annual Overlay Program aims to maintain existing streets to protect the initial investment in the street and to ensure an adequate quality driving surface for mobility and public safety.