Valencia Street Watermain Replacement (Closed)

Project Overview: EW238 This project replaced the following utilities within the Valencia Street corridor: In addition to the utility replacements, the corridor roadway was repaved, and sidewalks were upgraded and replaced as needed. This project ensures continued reliability of our utilities. Project Status – Completed This project was completed in June, 2024. Contact Freeman (Fritz) ... Read more

West Cemetery Creek Water Quality Project

​​​​​​​​​​​Project Overview: EN05​3 ​​This project included the design and construction of stream bank and channel stabilization features along West Cemetery Creek. This project installed natural bed and bank features, facilitated stormwater dispersion along the creek, and reduced sediment loads to improve water quality and restore natural processes in West Cemetery Creek and downstream water bodies.  Funding ... Read more

2019 Transportation Benefit District Projects

​​Project Overview:  ES-0547 This project consists of Transportation Benefit District-funded pedestrian and bicycle improvements throughout Bellingham.  The purpose of this project is to reduce risk and improve connectivity for pedestrian and bike travel in accordance with the City’s Bicycle and Pedestrian Master plans.  This project includes new sidewalks on portions of Yew Street, 24th and Lakeway / ... Read more

Lakeway Drive Bikeway Study

This study is a comprehensive look at how to provide a bikeway on Lakeway Drive from Woburn to Ellis, as indicated in the 2014 Bicycle Master Plan. Pedestrian improvement needs will also be considered as recommended in the 2012 Pedestrian Master Plan.
Secret Link