Over-water walkway extending from the north end of Boulevard Park to the Bellingham Center Waterfront (former GP site).
Acquiring land along the abandoned railway between Roeder Avenue and Irongate Road for the Bay to Baker Trail creating a trail corridor between Orchard Drive and James Street.
Exchange of easement rights between the City and Pugest Sound Energy so a trail in the Puget neighborhood can be made.
The playground equipment at Boulevard Park is scheduled for replacement in May-June 2013.
Replacement of a failing septic system.
This trail project is situated in the 113-acre Samish Hill Open Space adjacent to the Puget and Samish Neighborhoods. The trail improvement generally followed an existing north-south foot path beginning at the foot of Racine Street.