Meridian Street Water Quality Retrofit

​​​​​Project Overview: EV162 This project will provide water quality retrofit treatment through construction of water quality treatment facilities along Meridian Street (State Route 539) between Bakerview Road and Stuart Road, and on Kellogg Road.  This project addresses untreated runoff from one of the highest-volume roadways in the City. Portions of Meridian Street, which has an estimated ... Read more

Harrison Street Slope Stabilization

​​​Project Overview: EW237​​ This project repaired a water main that was originally installed in 1992. The water main is in good condition but due to the slope above slipping, the pipe came apart at the joints on more than one occasion. In addition, the slippage caused a rock wall to collapse. The repairs replaced a section of the existing ... Read more

Anderson Creek Water Quality Improvements Project

​​​​​​​​​​​​Project Overview: EN0051​ The Anderson Creek Water Quality Improvements project improves water quality and habitat conditions in Anderson Creek, located between Mirror Lake and the southeast end of the Lake Whatcom Reservoir. This project supports water quality improvements in Lake Whatcom by reversing historical impacts and restoring natural processes within the Anderson Creek corridor. This ... Read more

West Cemetery Creek Water Quality Project

Stream in a forest
​​​​​​​​​​​Project Overview: EN05​3 ​​This project included the design and construction of stream bank and channel stabilization features along West Cemetery Creek. This project installed natural bed and bank features, facilitated stormwater dispersion along the creek, and reduced sediment loads to improve water quality and restore natural processes in West Cemetery Creek and downstream water bodies.  Funding ... Read more

Boulevard Park Restroom Building

​​Description Constructed in 1979, the existing restroom building at the north end of the park is located within a contaminated​ cleanup site and in an area susceptible to ground settlement. In addition, the finished elevation of the existing restroom building may be less than the recommended elevation to account for sea-level rise. The existing restroom ... Read more